Ç¥ÁØÈ­ Âü¿©¾È³»

 
  • ȸÀǹ®¼­
  • ȸÀÇÀÏÁ¤
  • À§¿ø¸í´Ü_¿ÀÇÁ
  • °úÁ¦ÇöȲ
  • Á¦Á¤/°³Á¤Ç¥ÁØ
  • ¸ÞÀϹ߼Û_¿ÀÇÁ
  • °øÁö»çÇ×_¿ÀÇÁ
  • Á¤º¸±³·ù°Ô½ÃÆÇ_¿ÀÇÁ
  • À¯Áöº¸¼ö
¸®½ºÆ® ¼ö :    
No. Ç¥ÁعøÈ£ Ç¥Áظí Á¦/°³Á¤ÀÏ ¡å
12872 TTAT.3G-28.709V19.0.0 3rd Generation Partnership Project;Technical Specification Group Services and System Aspects;Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions(Release 19) 2025-11-04
12871 TTAT.3G-29.061V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Interworking between the Public Land Mobile Network (PLMN) supporting packet based services and Packet Data Networks (PDN)(Release 19) 2025-11-04
12870 TTAT.3G-29.109V17.1.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Generic Authentication Architecture (GAA); Zh and Zn Interfaces based on the Diameter protocol; Stage 3(Release 17) 2025-11-04
12869 TTAT.3G-29.109V18.1.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Generic Authentication Architecture (GAA); Zh and Zn Interfaces based on the Diameter protocol; Stage 3(Release 18) 2025-11-04
12868 TTAT.3G-29.118V19.1.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Mobility Management Entity (MME) - Visitor Location Register (VLR) SGs interface specification(Release 19) 2025-11-04
12867 TTAT.3G-29.122V18.8.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;T8 reference point for Northbound APIs(Release 18) 2025-11-04
12866 TTAT.3G-29.122V19.3.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;T8 reference point for Northbound APIs(Release 19) 2025-11-04
12865 TTAT.3G-29.162V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Interworking between the IM CN subsystem and IP networks(Release 19) 2025-11-04
12864 TTAT.3G-29.163V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Interworking between the IP Multimedia (IM) Core Network (CN) subsystem and Circuit Switched (CS) networks(Release 19) 2025-11-04
12863 TTAT.3G-29.164V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Interworking between the 3GPP CS domain with BICC or ISUP as signalling protocol and external SIP-I networks(Release 19) 2025-11-04