Ç¥ÁØÈ­ Âü¿©¾È³»

 
  • ȸÀǹ®¼­
  • ȸÀÇÀÏÁ¤
  • À§¿ø¸í´Ü_¿ÀÇÁ
  • °úÁ¦ÇöȲ
  • Á¦Á¤/°³Á¤Ç¥ÁØ
  • ¸ÞÀϹ߼Û_¿ÀÇÁ
  • °øÁö»çÇ×_¿ÀÇÁ
  • Á¤º¸±³·ù°Ô½ÃÆÇ_¿ÀÇÁ
  • À¯Áöº¸¼ö
¸®½ºÆ® ¼ö :    
No. Ç¥ÁعøÈ£ Ç¥Áظí Á¦/°³Á¤ÀÏ ¡å
4834 TTAT.3G-29.212(R11-11.8.0) Policy and Charging Control (PCC); Reference points 2013-08-26
4833 TTAT.3G-29.213(R11-11.6.0) Policy and Charging Control signalling flows and Quality of Service (QoS) parameter mapping 2013-08-26
4832 TTAT.3G-29.214(R11-11.8.0) Policy and Charging Control over Rx reference point 2013-08-26
4831 TTAT.3G-29.215(R11-11.8.0) Policy and Charging Control (PCC) over S9 reference point; Stage 3 2013-08-26
4830 TTAT.3G-29.219(R11-11.4.0) Policy and Charging Control: Spending Limit Reporting over Sy reference point 2013-08-26
4829 TTAT.3G-29.228(R11-11.7.0) IP Multimedia (IM) Subsystem Cx and Dx interfaces; Signalling flows and message contents 2013-08-26
4828 TTAT.3G-29.229(R11-11.3.0) Cx and Dx interfaces based on the Diameter protocol; Protocol details 2013-08-26
4827 TTAT.3G-29.230(R11-11.6.0) Diameter applications; 3GPP specific codes and identifiers 2013-08-26
4826 TTAT.3G-29.231(R11-11.0.0) Application of SIP-I Protocols to Circuit Switched (CS) Core Network Architecture;Stage 3 2013-08-26
4825 TTAT.3G-29.232(R11-11.1.0) Media Gateway Controller (MGC) - Media Gateway (MGW) interface; Stage 3 2013-08-26