Ç¥ÁØÈ­ Âü¿©¾È³»

 
  • ȸÀǹ®¼­
  • ȸÀÇÀÏÁ¤
  • À§¿ø¸í´Ü_¿ÀÇÁ
  • °úÁ¦ÇöȲ
  • Á¦Á¤/°³Á¤Ç¥ÁØ
  • ¸ÞÀϹ߼Û_¿ÀÇÁ
  • °øÁö»çÇ×_¿ÀÇÁ
  • Á¤º¸±³·ù°Ô½ÃÆÇ_¿ÀÇÁ
  • À¯Áöº¸¼ö
¸®½ºÆ® ¼ö :    
No. Ç¥ÁعøÈ£ Ç¥Áظí Á¦/°³Á¤ÀÏ ¡å
2043 TTAT.3G-29.334V17.1.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;IMS Application Level Gateway (IMS-ALG) - IMS Access Gateway (IMS-AGW); Iq Interface; Stage 3 2022-08-05
2042 TTAT.3G-29.336V17.3.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Home Subscriber Server (HSS) diameter interfaces for interworking with packet data networks and applications 2022-08-05
2041 TTAT.3G-29.337V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Diameter-based T4 Interface for communications with packet data networks and applications 2022-08-05
2040 TTAT.3G-29.343V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Proximity-services (ProSe) function to ProSe application server aspects (PC2); Stage 3 2022-08-05
2039 TTAT.3G-29.344V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Proximity-services (ProSe) function to Home Subscriber Server (HSS) aspects; Stage 3 2022-08-05
2038 TTAT.3G-29.345V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Inter-Proximity-services (Prose) function signalling aspects; Stage 3 2022-08-05
2037 TTAT.3G-29.364V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;IP Multimedia Subsystem (IMS) Application Server (AS) service data descriptions for AS interoperability 2022-08-05
2036 TTAT.3G-29.368V17.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Tsp interface protocol between the MTC Interworking Function (MTC-IWF) and Service Capability Server (SCS) 2022-08-05
2035 TTAT.3G-29.379V16.4.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Mission Critical Push To Talk (MCPTT) call control interworking with Land Mobile Radio (LMR) systems; Stage-3 2022-08-05
2034 TTAT.3G-29.379V17.4.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Mission Critical Push To Talk (MCPTT) call control interworking with Land Mobile Radio (LMR) systems; Stage-3 2022-08-05