Ç¥ÁØ

No Ç¥ÁعøÈ£ Ç¥ÁØÁ¦¸ñ Á¦°³Á¤ÀÏ Á¤·Ä¹æÇâ
35820 TTAT.3G-29.244V19.3.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Interface between the Control Plane and the User Plane nodes(Release 19) 2026-02-02
35819 TTAT.3G-29.250V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Nu reference point between SCEF and PFDF for sponsored data connectivity(Release 19) 2026-02-02
35818 TTAT.3G-29.251V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Gw and Gwn reference point for sponsored data connectivity(Release 19) 2026-02-02
35817 TTAT.3G-29.255V19.2.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Uncrewed Aerial System Service Supplier (USS) Services; Stage 3(Release 19) 2026-02-02
35816 TTAT.3G-29.256V19.3.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Uncrewed Aerial Systems Network Function (UAS-NF); Aerial Management Services; Stage 3(Release 19) 2026-02-02
35815 TTAT.3G-29.257V19.4.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Application layer support for Uncrewed Aerial System (UAS); UAS Application Enabler (UAE) Server Services; Stage 3(Release 19) 2026-02-02
35814 TTAT.3G-29.272V19.3.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Evolved Packet System (EPS); Mobility Management Entity (MME) and Serving GPRS Support Node (SGSN) related interfaces based on Diameter protocol(Release 19) 2026-02-02
35813 TTAT.3G-29.274V19.4.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;3GPP Evolved Packet System (EPS); Evolved General Packet Radio Service (GPRS) Tunnelling Protocol for Control plane (GTPv2-C); Stage 3(Release 19) 2026-02-02
35812 TTAT.3G-29.275V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Proxy Mobile IPv6 (PMIPv6) based Mobility and Tunnelling protocols; Stage 3(Release 19) 2026-02-02
35811 TTAT.3G-29.276V19.0.0 3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;3GPP Evolved Packet System (EPS); Optimized handover procedures and protocols between E-UTRAN access and cdma2000 HRPD Access; Stage 3(Release 19) 2026-02-02